Backup power system · Pretoria CBD installation

Backup Power Systems Installation in Pretoria CBD

When the mains drops, the lights, fridge, router and cameras stay on.

Inverter and battery systems for offices, shops and apartment buildings in the Pretoria CBD, wired around the circuits you need to keep running.

How it works

Cut the mains

A backup power system keeps your essential circuits running when the grid drops. Try the simulation below to see how power flows from the mains, through the inverter and battery, to the circuits you choose to back up.

MainsGrid supply
Inverter + batteryAvailable
Essential boardSelected circuits
LoadsKept on
  • Lights
  • Fridge
  • Router
  • CCTV
  • PCs

Normal supply: mains power passes through the inverter to your essential circuits.

This is a visual simulation only and does not control physical electrical equipment.

What we install

Backup power equipment we install

Inverter and battery systems

Backup power systems sized around your connected load and the number of hours you want to remain powered. Wall-mounted equipment can help where floor space is limited.

Essential-circuits board

An essential-circuits board separates the lights, selected plugs, fridge and network equipment from heavy loads such as geysers and stoves, helping you manage battery capacity.

CCTV, alarm and network backup

Keep selected security cameras, recorders, alarm panels and fibre routers on the backup supply, subject to system sizing and compatibility.

Solar-ready design

Plan the inverter, battery and essential circuits so compatible solar panels can be added later without unnecessarily reworking the installation.

Sizing estimate

How big a system do you need?

Wattages are typical estimates. Actual equipment consumption and the final system specification must be confirmed during a site assessment.

LED lights

10 W each

10

Fridge or freezer

150 W each

1

Wi-Fi router and fibre box

20 W each

1

CCTV cameras

8 W each

4

CCTV recorder

25 W each

1

Desktop PC with monitor

150 W each

2

TV or screen

100 W each

0

Split aircon, 12,000 BTU

1100 W each

0

Microwave

1200 W each

0

Kettle

2000 W each

0
4 hours

Connected load

627 W

Suggested inverter

3 kVA

Estimated battery

5.12 kWh

Our smallest system is 3 kVA with a 2.56 kWh battery.

Inverter size allows for start-up surges from motors like fridges. Battery size allows for usable capacity and conversion losses. Geysers and stoves are best left off the battery. This is a starting figure, not a quote.

This calculator is a preliminary sizing aid and does not replace a site assessment, inverter compatibility checks, battery discharge limits, surge assessment or final electrical design.

Pretoria CBD buildings

Installing backup power in a Pretoria CBD building

Backup power systems in the Pretoria CBD are often installed in shared buildings such as apartment blocks, office suites and retail premises. A few practical points help an installation go smoothly.

  • Shared buildings may require approval from the body corporate, landlord or managing agent before installation work begins.
  • Inverters and batteries need suitable mounting space, ventilation and safe access.
  • Access arrangements may include security procedures, lifts and loading bays.
  • Cable routes through shafts, ceilings and common areas must be agreed during the site visit.
  • Equipment placement and installation methods must suit the building and applicable requirements.

Watt Electrical Energy Solutions can provide the proposed system details required by the building's managing agent, landlord or body corporate.

The process

How your backup power installation works

  1. 1

    Site visit

    Walk the building, list the loads to back up and identify suitable equipment locations.

  2. 2

    Written quote

    Confirm the proposed system size and which circuits will and will not receive backup power.

  3. 3

    Building approval and access

    Arrange necessary approval from the body corporate, landlord or managing agent, together with security access.

  4. 4

    Installation

    Mount the equipment, install or connect the essential-circuits board as specified, and label every circuit.

  5. 5

    Test and handover

    With the customer present, demonstrate the approved backup operation and explain exactly which circuits remain powered during a mains interruption.

FAQs

Backup power in Pretoria CBD — FAQs

Get a quote

Get a backup power installation quote

Tell us what you need to keep running and how long for. We'll come back with a clear, itemised quotation for your Pretoria CBD premises.

Request Your Free Quote

We'll get back to you with the next steps